BlueNord July production falls to 38.9 mboepd on operational issues
BlueNord ASA reported preliminary July production of 38.9 mboepd net, down from typical levels due to operational disruptions.
The Tyra hub produced 19.5 mboepd net after a deluge system false activation on Gorm reduced uptime, despite stable periods averaging 24 mboepd. Production resumed by month-end.
Base assets produced 19.3 mboepd net, also affected by the Gorm shutdown. Compressor leaks on Gorm and produced water system issues on Halfdan were repaired, with full production restored.
This report was generated by FilingReader's AI system from regulatory filings and company disclosures. To request a correction, contact editorial@filingreader.com
Primary Source Document
News Alerts
Get instant email alerts when BlueNord ASA publishes news
Free account required • Unsubscribe anytime