FilingReader Intelligence

JSW Energy expands renewable capacity to 13,295 MW

November 10, 2025 at 07:07 PM UTCBy FilingReader AI

JSW Energy announced on November 10, 2025, the successful commissioning of 85 MW of new renewable energy capacity, comprising 74 MW of solar and 11 MW of wind power. This expansion elevates the company's total installed capacity to 13,295 MW.

With this commissioning, renewable sources now constitute 57% of JSW Energy's overall capacity, including 3,720 MW from wind, 2,286 MW from solar, and 1,631 MW from hydro. The company's total locked-in generation capacity has reached 30.5 GW, which includes 13.3 GW operational, 12.5 GW under construction, and 150 MW under acquisition.

JSW Energy also reported 29.4 GWh of locked-in energy storage capacity, consisting of 26.4 GWh from hydro pumped storage projects and 3.0 GWh from battery energy storage systems. The company aims to achieve 30 GW generation capacity and 40 GWh of energy storage capacity by FY 2030, with a long-term goal of carbon neutrality by 2050.

This report was generated by FilingReader's AI system from regulatory filings and company disclosures. To request a correction, contact editorial@filingreader.com

BSE:JSWENERGYBombay Stock Exchange

News Alerts

Get instant email alerts when JSW Energy publishes news

Free account required • Unsubscribe anytime

Filing Activity Timeline

View Complete Filing History →