Adani Green Energy adds 112.5 MW to operational renewable capacity
Adani Green Energy Limited (AGEL) announced the operationalization of an aggregate 112.5 MW of power projects at Khavda, Gujarat, as of September 30, 2025. This expansion includes 87.5 MW from Adani Renewable Energy Fifty Six Limited (solar) and 25 MW from Adani Green Energy Twenty Five B Limited (hybrid).
With the commissioning of these plants, AGEL's total operational renewable generation capacity has increased to 16,598.6 MW. The decision to operationalize these plants and commence power generation was made at 11:43 p.m. on September 30, 2025, following relevant clearances.
This intimation was made under Regulation 30 of the SEBI (Listing Obligations and Disclosures Requirements) Regulations, 2015, to both BSE Limited and The National Stock Exchange of India Limited. The announcement was signed by Pragnesh Darji, company secretary for Adani Green Energy Limited.
This report was generated by FilingReader's AI system from regulatory filings and company disclosures. To request a correction, contact editorial@filingreader.com
Primary Source Document
News Alerts
Get instant email alerts when Adani Green Energy publishes news
Free account required • Unsubscribe anytime