FilingReader Intelligence

NTPC subsidiary commissions 75 MW green energy capacity

May 1, 2025 at 07:06 PM UTCBy FilingReader AI

NTPC announced today that its subsidiary, NTPC Green Energy Limited, has declared the Commercial Operation Date (COD) for 75 MW of renewable energy capacity, effective May 2, 2025. This capacity is part of IRCON Renewable Power Limited (IRPL), a joint venture with Ayana Renewable Power Pvt. Ltd. The commissioned capacity is cumulative 225 MW out of a total of 500 MW plant capacity. With this addition, the total installed and commercial capacity of the NTPC group now reaches 80,095 MW. The disclosure was made under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.

This report was generated by FilingReader's AI system from regulatory filings and company disclosures. To request a correction, contact editorial@filingreader.com

BSE:NTPCBombay Stock Exchange

News Alerts

Get instant email alerts when NTPC publishes news

Free account required • Unsubscribe anytime

Filing Activity Timeline

View Complete Filing History →